wave analysis
Going Beyond the Code for Resilience at Major Wastewater Treatment Facility
When developing the structural design for a 2.5-mile-long floodwall to protect the Passaic Valley Sewerage Commission’s (PVSC) Newark, NJ, plant – a plant that took on 200 million gallons of floodwater during Superstorm Sandy in 2012 and was inoperable for ...
- All
- Industry Trends
- Project News
Industry Trends, Project News
Going Beyond the Code for Resilience at Major Wastewater Treatment Facility
When developing the structural design for a 2.5-mile-long floodwall to protect the Passaic Valley Sewerage Commission’s…